Story
40 percent of roads damaged by rain and digging: Strange engineering... Corporation tenders before surveying the damaged roads.
Here is the translation of the given Hindi text into English: "40 percent roads damaged by rain and digging: Amazing engineering... Corporation tenders before surveying damaged roads - Bhopal News. Roads throughout the city are in disrepair, with gravel scattered here and there, and potholes as deep as a foot or more. The PWD has set a deadline of September 30 for the maintenance of its 174 km of roads. However, the municipal corporation does not have a record of how it has addressed the issue of damaged roads in the current situation."
Source articles
40 प्रतिशत सड़कें बारिश-खुदाई से खराब:अजब इंजीनियरिंग... खराब सड़कों का सर्वे कराने से पहले निगम ने किए टेंडर