Story
Potholes, mud, and slippery conditions on ROB's diverted route: 20 villages connected to Dhara's Sunarkhedi underpass; two-wheeler riders most affected.
Under the Indore-Dahod rail project, a railway overbridge (ROB) is being constructed on the Nagda-Gujri route in Dhar. Due to its construction, traffic was diverted from the Sunarkhedi Road underpass. The road has now deteriorated due to constant vehicle pressure, causing inconvenience to people. Several potholes have appeared on the road, and its surface has been eroded, with mud remaining. Conditions worsen during rains, leading to increased slipperiness on the road.
Source articles
ROB के डायवर्टेड रास्ते पर गड्ढे, कीचड़ और फिसलन:धार के सुनारखेड़ी अंडरपास से 20 गांव जुड़े; दोपहिया वाहन चालक सबसे ज्यादा परेशान