Story
Lucknow: The second phase of the metro is facing hurdles due to 450 trees and seven small reservoirs, leading to a period of deliberation on its shifting.
The second phase of the metro project will cut across 450 trees and seven small water bodies. Instead of cutting down the trees, the metro administration is considering shifting them and repairing the water bodies.
Source articles
लखनऊ: मेट्रो के दूसरे चरण के आड़े आ रहे 450 पेड़, सात छोटे जलाशय, शिफ्टिंग पर हो रहा मंथन