Story
Mumbai's Matunga workshop goes solar with 2MW rooftop capacity, set to meet 42.5% of electricity needs and save central railway Rs 1.90 crore annually
Central Railway's Matunga Workshop has been upgraded with a 2 MW rooftop solar power system to enhance sustainability. This installation is estimated to provide 42.5% of the workshop's electricity needs and save Rs 1.90 crore per year. The solar plants are financed through the Renewable Energy Service Company model without upfront investments from the Railways. Approximately 2,340 metric tonnes of
Source articles
- Mumbai's Matunga workshop goes solar with 2MW rooftop capacity, set to meet 42.5% of electricity needs and save central railway Rs 1.90 crore annually