Story
Atal Setu-Mumbai-Pune Expressway link reaches 67% completion, with 7.35-km elevated corridor set to cut travel time by up to 90 minutes; here's what to know about its route, airport and port connectivity
Source articles
- Atal Setu-Mumbai-Pune Expressway link reaches 67% completion, with 7.35-km elevated corridor set to cut travel time by up to 90 minutes; here's what to know about its route, airport and port connectivity - The Times of India